Multi-Family HVAC Load Calculations and Energy Code Compliance
Engineer stamped
Cooling and heating loads run for each unit type, and energy code compliance, for apartments, condominiums and townhomes of any size.
In a multi-family building every decision is repeated. Equipment is selected per unit, so a tonnage rounded up once is rounded up in every unit of that type. We prepare stamped cooling and heating load calculations and energy code compliance for multi-family buildings, with the loads run for each unit type.
Buildings we work on
- Apartment buildings
- Condominiums
- Townhomes
- Mixed-use buildings with apartments and commercial space
Any size, up to multi-building developments.
What you get
- Room-by-room cooling and heating loads for each unit type
- Ventilation rates to the governing code for the jurisdiction
- A zone map, where the building has more than one zone
- Energy code compliance documentation, in the format the plan reviewer expects
- A stamped document
How multi-family buildings differ
Units are not interchangeable. Orientation, glazing and party walls change the load from one unit to the next. A corner unit on the top floor is not an interior unit on the second. We run the loads for each unit type with its own orientation, glazing and party walls, instead of one average for the whole building.
The story count changes the code. Under the energy code, a residential building of three stories or fewer falls under the residential provisions, and one of four stories or more under the commercial provisions. The forms, the software and the requirements differ, so the story count is the first thing we check.
Loads and compliance share their inputs. The envelope and system inputs behind the load calculation are the same ones the energy compliance rests on. Running both together removes a class of discrepancy that plan reviewers look for.
Scale. A development is checked building by building. We don't borrow assumptions from the building next door.
Where we have done this work
Condominiums, apartments and townhomes in Lakewood Ranch, Hollywood, Fort Myers, Vero Beach, Miami Beach and Sarasota, Florida, and a mixed-use building with apartments and commercial space in Austin, Texas.
Adicot provides the same services in every state it is licensed in. The codes each state has adopted are on our state pages, starting with Florida, Texas and Massachusetts.
Representative projects
Multifamily · Lakewood Ranch, Florida
30-Unit Condominium Using Split System Heat Pumps
Thirty condominium units, each with its own split-system heat pump. The cooling and heating loads and the energy code compliance were prepared together from the same envelope and system inputs, with the orientation, glazing and party walls carried for each unit type.
- Scope
- Loads + energy compliance
- Units
- 30
- Equipment
- Split-system heat pumps
FAQs
Do you run the loads for every unit?
For each unit type, with its own orientation, glazing and party walls, instead of one average for the whole building. A corner unit on the top floor does not have the load of an interior unit on the second.
Is a multi-family building residential or commercial under the energy code?
A residential building of three stories or fewer falls under the energy code's residential provisions, and one of four stories or more under its commercial provisions. The forms, the software and the requirements differ, so the story count is the first thing we check.
Which multi-family buildings do you work on?
Apartment buildings, condominiums, townhomes, and mixed-use buildings with apartments and commercial space, of any size up to multi-building developments.
Can you do the energy code compliance as well?
Yes. The envelope and system inputs behind the load calculation are the same ones the energy compliance rests on, and running both together removes a class of discrepancy that plan reviewers look for.
How long does it take?
Inquiries are answered within 1 to 2 business days. Most load calculations are returned within 5 to 10 business days of scope confirmation, and rush turnarounds are available when the schedule requires one.
How much does it cost?
Most projects are priced through the online quote tool: enter the project type and square footage, and the fee appears on screen. That figure is preliminary. The final fee is confirmed in writing after we review your documents and scope.