HVAC Load Calculations and Energy Code Compliance in Massachusetts
Massachusetts-licensed PE
Stamped cooling and heating load calculations and energy code compliance for industrial, commercial and multi-family projects in Massachusetts, from a Boston-based practice.
Adicot has been headquartered in Boston since 2022. Massachusetts has three tiers of energy code, and which one governs a project depends on the city or town it is in, so the municipality is the first thing we check.
The same services in every state
Adicot provides the same engineering services in every state it is licensed in, for industrial, commercial and multi-family buildings of any size. What changes from state to state is the code the work is held to.
- Cooling Load/Heat Load Calculations: room-by-room loads worked with ASHRAE methods, with ventilation rates to the adopted code
- Energy Code Compliance: the building modeled and compliance demonstrated on performance where the code allows it, in the format the plan reviewer expects
Both are sealed by a professional engineer licensed in the state. Get a Quote to see the fee.
We work on industrial buildings, commercial buildings from offices and retail to restaurants and clinics, and multi-family buildings.
The codes in force in Massachusetts
As of October 2026:
- Building code: the Massachusetts State Building Code, 780 CMR, 10th Edition. It took effect on October 11, 2024 and has been the only edition in force since July 1, 2025.
- Base energy code: 780 CMR Chapter 13, which is the 2021 International Energy Conservation Code with Massachusetts amendments.
- Stretch Code: 225 CMR 23 for commercial and multi-family buildings, adopted by most municipalities. It is administered by the Department of Energy Resources.
- Specialized Code: the Stretch Code plus its Appendix CC, adopted by a smaller group of municipalities by local vote.
- Mechanical: the 2021 International Mechanical Code as amended by 780 CMR Chapter 28.
What is particular to Massachusetts
Three tiers. Every municipality is a base, Stretch or Specialized code community. The Department of Energy Resources publishes the current list, and it changes as towns vote.
Multi-family. Multi-family buildings over three stories fall under the commercial code.
Climate. The whole state is in climate zone 5A: cold winters, humid summers.
Projects in Massachusetts
Both are substation and utility control building work.
- Load calculation for a substation building in Beverly, with ventilation sized to the hydrogen concentration limit, 2025
- Load calculation for a switchgear building in Hanover, 2026
FAQs
Which energy code applies to commercial projects in Massachusetts?
As of October 2026: Base energy code: 780 CMR Chapter 13, which is the 2021 International Energy Conservation Code with Massachusetts amendments. Stretch Code: 225 CMR 23 for commercial and multi-family buildings, adopted by most municipalities. It is administered by the Department of Energy Resources. Specialized Code: the Stretch Code plus its Appendix CC, adopted by a smaller group of municipalities by local vote. We confirm which code and edition govern the project before work starts.
Can you stamp HVAC load and energy code calculations in Massachusetts?
Yes. Adicot is licensed in Massachusetts, and the calculations are sealed by a Massachusetts-licensed professional engineer. We are licensed in 12 states in all; see our services by state.
How long does it take?
Inquiries are answered within 1 to 2 business days. Most load calculations are returned within 5 to 10 business days of scope confirmation, and rush turnarounds are available when the schedule requires one.
What do you need from me to start?
The drawings, the project type, the square footage and the turnaround you need. If something is missing, we send a list of what is still needed; see an example of a clear response.
How much does it cost?
Most projects are priced through the online quote tool: enter the project type and square footage, and the fee appears on screen. That figure is preliminary. The final fee is confirmed in writing after we review your documents and scope.